Cameroon vs Democratic Republic of Congo: Dealing with construction permits: Quality control before construction

Cameroon
1 DB16-20 methodology
in 2019
Democratic Republic of Congo
1 DB16-20 methodology
in 2019
Cameroon rank
1st
Democratic Republic of Congo rank
1st

Dealing with construction permits: Quality control before construction over time

  • Cameroon
  • Democratic Republic of Congo
00.20.40.60.81201420162019

How they compare

Cameroon currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Democratic Republic of Congo, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Cameroon ahead.

Cameroon ranks 1st and Democratic Republic of Congo ranks 1st of 183 countries.

Cameroon has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Cameroon or Democratic Republic of Congo?
Cameroon, at 1 DB16-20 methodology against 1 DB16-20 methodology in Democratic Republic of Congo as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Cameroon and Democratic Republic of Congo?
0 DB16-20 methodology, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Democratic Republic of Congo?
6 years are reported by both, from 2014 to 2019.
How do Cameroon and Democratic Republic of Congo rank globally for dealing with construction permits: quality control before construction?
Cameroon ranks 1st and Democratic Republic of Congo ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.