Canada vs Lesotho: Dealing with construction permits: Quality control before construction
Canada
1 DB16-20 methodology
in 2019
Lesotho
1 DB16-20 methodology
in 2019
Canada rank
1st
Lesotho rank
1st
Dealing with construction permits: Quality control before construction over time
- Canada
- Lesotho
How they compare
Canada currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Lesotho, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Lesotho has been ahead every year.
Canada ranks 1st and Lesotho ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Canada or Lesotho?
- Canada, at 1 DB16-20 methodology against 1 DB16-20 methodology in Lesotho as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Canada and Lesotho?
- 0 DB16-20 methodology, with Canada ahead.
- How many years of comparable data are there for Canada and Lesotho?
- 6 years are reported by both, from 2014 to 2019.
- How do Canada and Lesotho rank globally for dealing with construction permits: quality control before construction?
- Canada ranks 1st and Lesotho ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.