Chad vs Ukraine: Dealing with construction permits: Quality control before

Chad
0 DB16-20 methodology
in 2019
Ukraine
0 DB16-20 methodology
in 2019
Chad rank
163rd
Ukraine rank
163rd

Dealing with construction permits: Quality control before over time

  • Chad
  • Ukraine
00.20.40.60.81201420162019

How they compare

Chad currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Ukraine, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Ukraine has been ahead every year.

Chad ranks 163rd and Ukraine ranks 163rd of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Chad or Ukraine?
Chad, at 0 DB16-20 methodology against 0 DB16-20 methodology in Ukraine as of 2019.
What is the difference in dealing with construction permits: quality control before between Chad and Ukraine?
0 DB16-20 methodology, with Chad ahead.
How many years of comparable data are there for Chad and Ukraine?
6 years are reported by both, from 2014 to 2019.
How do Chad and Ukraine rank globally for dealing with construction permits: quality control before?
Chad ranks 163rd and Ukraine ranks 163rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chad vs Ukraine: Dealing with construction permits: Quality control before. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/chad/ukraine/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/chad/ukraine/">Chad vs Ukraine: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.