China vs Kuwait: Dealing with construction permits: Quality control before construction
China
1 DB16-20 methodology
in 2019
Kuwait
1 DB16-20 methodology
in 2019
China rank
1st
Kuwait rank
1st
Dealing with construction permits: Quality control before construction over time
- China
- Kuwait
How they compare
China currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Kuwait, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Kuwait has been ahead every year.
China ranks 1st and Kuwait ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, China or Kuwait?
- China, at 1 DB16-20 methodology against 1 DB16-20 methodology in Kuwait as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between China and Kuwait?
- 0 DB16-20 methodology, with China ahead.
- How many years of comparable data are there for China and Kuwait?
- 6 years are reported by both, from 2014 to 2019.
- How do China and Kuwait rank globally for dealing with construction permits: quality control before construction?
- China ranks 1st and Kuwait ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.