Democratic Republic of Congo vs Fiji: Dealing with construction permits: Quality control before construction

Democratic Republic of Congo
1 DB16-20 methodology
in 2019
Fiji
1 DB16-20 methodology
in 2019
Democratic Republic of Congo rank
1st
Fiji rank
1st

Dealing with construction permits: Quality control before construction over time

  • Democratic Republic of Congo
  • Fiji
00.20.40.60.81201420162019

How they compare

Democratic Republic of Congo currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Fiji, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Fiji has been ahead every year.

Democratic Republic of Congo ranks 1st and Fiji ranks 1st of 183 countries.

Fiji has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Democratic Republic of Congo or Fiji?
Democratic Republic of Congo, at 1 DB16-20 methodology against 1 DB16-20 methodology in Fiji as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Democratic Republic of Congo and Fiji?
0 DB16-20 methodology, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Democratic Republic of Congo and Fiji?
6 years are reported by both, from 2014 to 2019.
How do Democratic Republic of Congo and Fiji rank globally for dealing with construction permits: quality control before construction?
Democratic Republic of Congo ranks 1st and Fiji ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of Congo vs Fiji: Dealing with construction permits: Quality control before construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/congo-dem-rep/fiji/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/congo-dem-rep/fiji/">Democratic Republic of Congo vs Fiji: Dealing with construction permits: Quality control before construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.