Democratic Republic of the Congo vs Norway: Dealing with construction permits: Quality control before

Democratic Republic of the Congo
1 DB16-20 methodology
in 2019
Norway
1 DB16-20 methodology
in 2019
Democratic Republic of the Congo rank
1st
Norway rank
1st

Dealing with construction permits: Quality control before over time

  • Democratic Republic of the Congo
  • Norway
00.20.40.60.81201420162019

How they compare

Democratic Republic of the Congo currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Norway, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Norway has been ahead every year.

Democratic Republic of the Congo ranks 1st and Norway ranks 1st of 185 countries.

Norway has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Democratic Republic of the Congo or Norway?
Democratic Republic of the Congo, at 1 DB16-20 methodology against 1 DB16-20 methodology in Norway as of 2019.
What is the difference in dealing with construction permits: quality control before between Democratic Republic of the Congo and Norway?
0 DB16-20 methodology, with Democratic Republic of the Congo ahead.
How many years of comparable data are there for Democratic Republic of the Congo and Norway?
6 years are reported by both, from 2014 to 2019.
How do Democratic Republic of the Congo and Norway rank globally for dealing with construction permits: quality control before?
Democratic Republic of the Congo ranks 1st and Norway ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of the Congo vs Norway: Dealing with construction permits: Quality control before. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/congo-dem-rep/norway/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/congo-dem-rep/norway/">Democratic Republic of the Congo vs Norway: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.