Congo vs Iran: Dealing with construction permits: Quality control before construction
Congo
1 DB16-20 methodology
in 2019
Iran
1 DB16-20 methodology
in 2019
Congo rank
1st
Iran rank
1st
Dealing with construction permits: Quality control before construction over time
- Congo
- Iran
How they compare
Congo currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Iran, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Iran has been ahead every year.
Congo ranks 1st and Iran ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Congo or Iran?
- Congo, at 1 DB16-20 methodology against 1 DB16-20 methodology in Iran as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Congo and Iran?
- 0 DB16-20 methodology, with Congo ahead.
- How many years of comparable data are there for Congo and Iran?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Iran rank globally for dealing with construction permits: quality control before construction?
- Congo ranks 1st and Iran ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.