Costa Rica vs Samoa: Dealing with construction permits: Quality control before
Costa Rica
1 DB16-20 methodology
in 2019
Samoa
1 DB16-20 methodology
in 2019
Costa Rica rank
1st
Samoa rank
1st
Dealing with construction permits: Quality control before over time
- Costa Rica
- Samoa
How they compare
Costa Rica currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Samoa has been ahead every year.
Costa Rica ranks 1st and Samoa ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Costa Rica or Samoa?
- Costa Rica, at 1 DB16-20 methodology against 1 DB16-20 methodology in Samoa as of 2019.
- What is the difference in dealing with construction permits: quality control before between Costa Rica and Samoa?
- 0 DB16-20 methodology, with Costa Rica ahead.
- How many years of comparable data are there for Costa Rica and Samoa?
- 6 years are reported by both, from 2014 to 2019.
- How do Costa Rica and Samoa rank globally for dealing with construction permits: quality control before?
- Costa Rica ranks 1st and Samoa ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.