Hong Kong vs Nepal: Dealing with construction permits: Quality control before

Hong Kong
1 DB16-20 methodology
in 2019
Nepal
1 DB16-20 methodology
in 2019
Hong Kong rank
1st
Nepal rank
1st

Dealing with construction permits: Quality control before over time

  • Hong Kong
  • Nepal
00.20.40.60.81201420162019

How they compare

Hong Kong currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Nepal, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Nepal has been ahead every year.

Hong Kong ranks 1st and Nepal ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Hong Kong or Nepal?
Hong Kong, at 1 DB16-20 methodology against 1 DB16-20 methodology in Nepal as of 2019.
What is the difference in dealing with construction permits: quality control before between Hong Kong and Nepal?
0 DB16-20 methodology, with Hong Kong ahead.
How many years of comparable data are there for Hong Kong and Nepal?
6 years are reported by both, from 2014 to 2019.
How do Hong Kong and Nepal rank globally for dealing with construction permits: quality control before?
Hong Kong ranks 1st and Nepal ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong vs Nepal: Dealing with construction permits: Quality control before. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/hong-kong-sar-china/nepal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/hong-kong-sar-china/nepal/">Hong Kong vs Nepal: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.