Hong Kong vs Panama: Dealing with construction permits: Quality control before
Hong Kong
1 DB16-20 methodology
in 2019
Panama
1 DB16-20 methodology
in 2019
Hong Kong rank
1st
Panama rank
1st
Dealing with construction permits: Quality control before over time
- Hong Kong
- Panama
How they compare
Hong Kong currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Panama, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Panama has been ahead every year.
Hong Kong ranks 1st and Panama ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Hong Kong or Panama?
- Hong Kong, at 1 DB16-20 methodology against 1 DB16-20 methodology in Panama as of 2019.
- What is the difference in dealing with construction permits: quality control before between Hong Kong and Panama?
- 0 DB16-20 methodology, with Hong Kong ahead.
- How many years of comparable data are there for Hong Kong and Panama?
- 6 years are reported by both, from 2014 to 2019.
- How do Hong Kong and Panama rank globally for dealing with construction permits: quality control before?
- Hong Kong ranks 1st and Panama ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.