Hungary vs Malta: Dealing with construction permits: Quality control before construction

Hungary
1 DB16-20 methodology
in 2019
Malta
1 DB16-20 methodology
in 2019
Hungary rank
1st
Malta rank
1st

Dealing with construction permits: Quality control before construction over time

  • Hungary
  • Malta
00.20.40.60.81201420162019

How they compare

Hungary currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Malta, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Malta has been ahead every year.

Hungary ranks 1st and Malta ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Hungary or Malta?
Hungary, at 1 DB16-20 methodology against 1 DB16-20 methodology in Malta as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Hungary and Malta?
0 DB16-20 methodology, with Hungary ahead.
How many years of comparable data are there for Hungary and Malta?
6 years are reported by both, from 2014 to 2019.
How do Hungary and Malta rank globally for dealing with construction permits: quality control before construction?
Hungary ranks 1st and Malta ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hungary vs Malta: Dealing with construction permits: Quality control before construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/hungary/malta/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/hungary/malta/">Hungary vs Malta: Dealing with construction permits: Quality control before construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.