Iran, Islamic Republic of vs Mali: Dealing with construction permits: Quality control before
Iran, Islamic Republic of
1 DB16-20 methodology
in 2019
Mali
1 DB16-20 methodology
in 2019
Iran, Islamic Republic of rank
1st
Mali rank
1st
Dealing with construction permits: Quality control before over time
- Iran, Islamic Republic of
- Mali
How they compare
Iran, Islamic Republic of currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Mali, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Mali has been ahead every year.
Iran, Islamic Republic of ranks 1st and Mali ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Iran, Islamic Republic of or Mali?
- Iran, Islamic Republic of, at 1 DB16-20 methodology against 1 DB16-20 methodology in Mali as of 2019.
- What is the difference in dealing with construction permits: quality control before between Iran, Islamic Republic of and Mali?
- 0 DB16-20 methodology, with Iran, Islamic Republic of ahead.
- How many years of comparable data are there for Iran, Islamic Republic of and Mali?
- 6 years are reported by both, from 2014 to 2019.
- How do Iran, Islamic Republic of and Mali rank globally for dealing with construction permits: quality control before?
- Iran, Islamic Republic of ranks 1st and Mali ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.