Kosovo vs Namibia: Dealing with construction permits: Quality control before construction
Kosovo
1 DB16-20 methodology
in 2019
Namibia
1 DB16-20 methodology
in 2019
Kosovo rank
1st
Namibia rank
1st
Dealing with construction permits: Quality control before construction over time
- Kosovo
- Namibia
How they compare
Kosovo currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Namibia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Namibia has been ahead every year.
Kosovo ranks 1st and Namibia ranks 1st of 1 groups.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Kosovo or Namibia?
- Kosovo, at 1 DB16-20 methodology against 1 DB16-20 methodology in Namibia as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Kosovo and Namibia?
- 0 DB16-20 methodology, with Kosovo ahead.
- How many years of comparable data are there for Kosovo and Namibia?
- 6 years are reported by both, from 2014 to 2019.
- How do Kosovo and Namibia rank globally for dealing with construction permits: quality control before construction?
- Kosovo ranks 1st and Namibia ranks 1st of 1 groups.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.