Kuwait vs Samoa: Dealing with construction permits: Quality control before construction

Kuwait
1 DB16-20 methodology
in 2019
Samoa
1 DB16-20 methodology
in 2019
Kuwait rank
1st
Samoa rank
1st

Dealing with construction permits: Quality control before construction over time

  • Kuwait
  • Samoa
00.20.40.60.81201420162019

How they compare

Kuwait currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Samoa has been ahead every year.

Kuwait ranks 1st and Samoa ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Kuwait or Samoa?
Kuwait, at 1 DB16-20 methodology against 1 DB16-20 methodology in Samoa as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Kuwait and Samoa?
0 DB16-20 methodology, with Kuwait ahead.
How many years of comparable data are there for Kuwait and Samoa?
6 years are reported by both, from 2014 to 2019.
How do Kuwait and Samoa rank globally for dealing with construction permits: quality control before construction?
Kuwait ranks 1st and Samoa ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.