Lesotho vs Spain: Dealing with construction permits: Quality control before construction
Lesotho
1 DB16-20 methodology
in 2019
Spain
1 DB16-20 methodology
in 2019
Lesotho rank
1st
Spain rank
1st
Dealing with construction permits: Quality control before construction over time
- Lesotho
- Spain
How they compare
Lesotho currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Spain has been ahead every year.
Lesotho ranks 1st and Spain ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Lesotho or Spain?
- Lesotho, at 1 DB16-20 methodology against 1 DB16-20 methodology in Spain as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Lesotho and Spain?
- 0 DB16-20 methodology, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Lesotho and Spain rank globally for dealing with construction permits: quality control before construction?
- Lesotho ranks 1st and Spain ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.