Lithuania vs Morocco: Dealing with construction permits: Quality control before construction

Lithuania
1 DB16-20 methodology
in 2019
Morocco
1 DB16-20 methodology
in 2019
Lithuania rank
1st
Morocco rank
1st

Dealing with construction permits: Quality control before construction over time

  • Lithuania
  • Morocco
00.20.40.60.81201420162019

How they compare

Lithuania currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Morocco, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Morocco has been ahead every year.

Lithuania ranks 1st and Morocco ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Lithuania or Morocco?
Lithuania, at 1 DB16-20 methodology against 1 DB16-20 methodology in Morocco as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Lithuania and Morocco?
0 DB16-20 methodology, with Lithuania ahead.
How many years of comparable data are there for Lithuania and Morocco?
6 years are reported by both, from 2014 to 2019.
How do Lithuania and Morocco rank globally for dealing with construction permits: quality control before construction?
Lithuania ranks 1st and Morocco ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.