Mexico vs Mongolia: Dealing with construction permits: Quality control before construction
Mexico
1 DB16-20 methodology
in 2019
Mongolia
1 DB16-20 methodology
in 2019
Mexico rank
1st
Mongolia rank
1st
Dealing with construction permits: Quality control before construction over time
- Mexico
- Mongolia
How they compare
Mexico currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Mongolia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Mongolia has been ahead every year.
Mexico ranks 1st and Mongolia ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Mexico or Mongolia?
- Mexico, at 1 DB16-20 methodology against 1 DB16-20 methodology in Mongolia as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Mexico and Mongolia?
- 0 DB16-20 methodology, with Mexico ahead.
- How many years of comparable data are there for Mexico and Mongolia?
- 6 years are reported by both, from 2014 to 2019.
- How do Mexico and Mongolia rank globally for dealing with construction permits: quality control before construction?
- Mexico ranks 1st and Mongolia ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.