Republic of Moldova vs Saint Kitts and Nevis: Dealing with construction permits: Quality control before

Republic of Moldova
1 DB16-20 methodology
in 2019
Saint Kitts and Nevis
1 DB16-20 methodology
in 2019
Republic of Moldova rank
1st
Saint Kitts and Nevis rank
1st

Dealing with construction permits: Quality control before over time

  • Republic of Moldova
  • Saint Kitts and Nevis
00.20.40.60.81201420162019

How they compare

Republic of Moldova currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Saint Kitts and Nevis, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Saint Kitts and Nevis has been ahead every year.

Republic of Moldova ranks 1st and Saint Kitts and Nevis ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Republic of Moldova or Saint Kitts and Nevis?
Republic of Moldova, at 1 DB16-20 methodology against 1 DB16-20 methodology in Saint Kitts and Nevis as of 2019.
What is the difference in dealing with construction permits: quality control before between Republic of Moldova and Saint Kitts and Nevis?
0 DB16-20 methodology, with Republic of Moldova ahead.
How many years of comparable data are there for Republic of Moldova and Saint Kitts and Nevis?
6 years are reported by both, from 2014 to 2019.
How do Republic of Moldova and Saint Kitts and Nevis rank globally for dealing with construction permits: quality control before?
Republic of Moldova ranks 1st and Saint Kitts and Nevis ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Republic of Moldova vs Saint Kitts and Nevis: Dealing with construction permits: Quality control before. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/moldova/st-kitts-and-nevis/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/moldova/st-kitts-and-nevis/">Republic of Moldova vs Saint Kitts and Nevis: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.