Mongolia vs Portugal: Dealing with construction permits: Quality control before

Mongolia
1 DB16-20 methodology
in 2019
Portugal
1 DB16-20 methodology
in 2019
Mongolia rank
1st
Portugal rank
1st

Dealing with construction permits: Quality control before over time

  • Mongolia
  • Portugal
00.20.40.60.81201420162019

How they compare

Mongolia currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Portugal, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Portugal has been ahead every year.

Mongolia ranks 1st and Portugal ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Mongolia or Portugal?
Mongolia, at 1 DB16-20 methodology against 1 DB16-20 methodology in Portugal as of 2019.
What is the difference in dealing with construction permits: quality control before between Mongolia and Portugal?
0 DB16-20 methodology, with Mongolia ahead.
How many years of comparable data are there for Mongolia and Portugal?
6 years are reported by both, from 2014 to 2019.
How do Mongolia and Portugal rank globally for dealing with construction permits: quality control before?
Mongolia ranks 1st and Portugal ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mongolia vs Portugal: Dealing with construction permits: Quality control before. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/mongolia/portugal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/mongolia/portugal/">Mongolia vs Portugal: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.