Namibia vs Norway: Dealing with construction permits: Quality control before construction
Namibia
1 DB16-20 methodology
in 2019
Norway
1 DB16-20 methodology
in 2019
Namibia rank
1st
Norway rank
1st
Dealing with construction permits: Quality control before construction over time
- Namibia
- Norway
How they compare
Namibia currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Norway, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Norway has been ahead every year.
Namibia ranks 1st and Norway ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Namibia or Norway?
- Namibia, at 1 DB16-20 methodology against 1 DB16-20 methodology in Norway as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Namibia and Norway?
- 0 DB16-20 methodology, with Namibia ahead.
- How many years of comparable data are there for Namibia and Norway?
- 6 years are reported by both, from 2014 to 2019.
- How do Namibia and Norway rank globally for dealing with construction permits: quality control before construction?
- Namibia ranks 1st and Norway ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.