Oman vs Tonga: Dealing with construction permits: Quality control before construction
Oman
1 DB16-20 methodology
in 2019
Tonga
1 DB16-20 methodology
in 2019
Oman rank
1st
Tonga rank
1st
Dealing with construction permits: Quality control before construction over time
- Oman
- Tonga
How they compare
Oman currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tonga has been ahead every year.
Oman ranks 1st and Tonga ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before construction, Oman or Tonga?
- Oman, at 1 DB16-20 methodology against 1 DB16-20 methodology in Tonga as of 2019.
- What is the difference in dealing with construction permits: quality control before construction between Oman and Tonga?
- 0 DB16-20 methodology, with Oman ahead.
- How many years of comparable data are there for Oman and Tonga?
- 6 years are reported by both, from 2014 to 2019.
- How do Oman and Tonga rank globally for dealing with construction permits: quality control before construction?
- Oman ranks 1st and Tonga ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.