Philippines vs Senegal: Dealing with construction permits: Quality control before construction

Philippines
1 DB16-20 methodology
in 2019
Senegal
1 DB16-20 methodology
in 2019
Philippines rank
1st
Senegal rank
1st

Dealing with construction permits: Quality control before construction over time

  • Philippines
  • Senegal
00.20.40.60.81201420162019

How they compare

Philippines currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Senegal, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Senegal has been ahead every year.

Philippines ranks 1st and Senegal ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Philippines or Senegal?
Philippines, at 1 DB16-20 methodology against 1 DB16-20 methodology in Senegal as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Philippines and Senegal?
0 DB16-20 methodology, with Philippines ahead.
How many years of comparable data are there for Philippines and Senegal?
6 years are reported by both, from 2014 to 2019.
How do Philippines and Senegal rank globally for dealing with construction permits: quality control before construction?
Philippines ranks 1st and Senegal ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Philippines vs Senegal: Dealing with construction permits: Quality control before construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/philippines/senegal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/philippines/senegal/">Philippines vs Senegal: Dealing with construction permits: Quality control before construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.