San Marino vs Suriname: Dealing with construction permits: Quality control before
San Marino
1 DB16-20 methodology
in 2019
Suriname
1 DB16-20 methodology
in 2019
San Marino rank
1st
Suriname rank
1st
Dealing with construction permits: Quality control before over time
- San Marino
- Suriname
How they compare
San Marino currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Suriname, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Suriname has been ahead every year.
San Marino ranks 1st and Suriname ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, San Marino or Suriname?
- San Marino, at 1 DB16-20 methodology against 1 DB16-20 methodology in Suriname as of 2019.
- What is the difference in dealing with construction permits: quality control before between San Marino and Suriname?
- 0 DB16-20 methodology, with San Marino ahead.
- How many years of comparable data are there for San Marino and Suriname?
- 6 years are reported by both, from 2014 to 2019.
- How do San Marino and Suriname rank globally for dealing with construction permits: quality control before?
- San Marino ranks 1st and Suriname ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.