San Marino vs Togo: Dealing with construction permits: Quality control before
Dealing with construction permits: Quality control before over time
- San Marino
- Togo
How they compare
San Marino currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was San Marino ahead.
San Marino ranks 1st and Togo ranks 1st of 186 countries.
San Marino has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, San Marino or Togo?
- San Marino, at 1 DB16-20 methodology against 1 DB16-20 methodology in Togo as of 2019.
- What is the difference in dealing with construction permits: quality control before between San Marino and Togo?
- 0 DB16-20 methodology, with San Marino ahead.
- How many years of comparable data are there for San Marino and Togo?
- 6 years are reported by both, from 2014 to 2019.
- How do San Marino and Togo rank globally for dealing with construction permits: quality control before?
- San Marino ranks 1st and Togo ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.