Solomon Islands vs Spain: Dealing with construction permits: Quality control before

Solomon Islands
1 DB16-20 methodology
in 2019
Spain
1 DB16-20 methodology
in 2019
Solomon Islands rank
1st
Spain rank
1st

Dealing with construction permits: Quality control before over time

  • Solomon Islands
  • Spain
00.20.40.60.81201420162019

How they compare

Solomon Islands currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Spain has been ahead every year.

Solomon Islands ranks 1st and Spain ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Solomon Islands or Spain?
Solomon Islands, at 1 DB16-20 methodology against 1 DB16-20 methodology in Spain as of 2019.
What is the difference in dealing with construction permits: quality control before between Solomon Islands and Spain?
0 DB16-20 methodology, with Solomon Islands ahead.
How many years of comparable data are there for Solomon Islands and Spain?
6 years are reported by both, from 2014 to 2019.
How do Solomon Islands and Spain rank globally for dealing with construction permits: quality control before?
Solomon Islands ranks 1st and Spain ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Solomon Islands vs Spain: Dealing with construction permits: Quality control before. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/solomon-islands/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/solomon-islands/spain/">Solomon Islands vs Spain: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.