Chinese Taipei vs Thailand: Dealing with construction permits: Quality control before

Chinese Taipei
1 DB16-20 methodology
in 2019
Thailand
1 DB16-20 methodology
in 2019
Chinese Taipei rank
1st
Thailand rank
1st

Dealing with construction permits: Quality control before over time

  • Chinese Taipei
  • Thailand
00.20.40.60.81201420162019

How they compare

Chinese Taipei currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Thailand has been ahead every year.

Chinese Taipei ranks 1st and Thailand ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Chinese Taipei or Thailand?
Chinese Taipei, at 1 DB16-20 methodology against 1 DB16-20 methodology in Thailand as of 2019.
What is the difference in dealing with construction permits: quality control before between Chinese Taipei and Thailand?
0 DB16-20 methodology, with Chinese Taipei ahead.
How many years of comparable data are there for Chinese Taipei and Thailand?
6 years are reported by both, from 2014 to 2019.
How do Chinese Taipei and Thailand rank globally for dealing with construction permits: quality control before?
Chinese Taipei ranks 1st and Thailand ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chinese Taipei vs Thailand: Dealing with construction permits: Quality control before. Statizoid. Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/taiwan/thailand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/taiwan/thailand/">Chinese Taipei vs Thailand: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.