Tunisia vs Viet Nam: Dealing with construction permits: Quality control before

Tunisia
1 DB16-20 methodology
in 2019
Viet Nam
1 DB16-20 methodology
in 2019
Tunisia rank
1st
Viet Nam rank
1st

Dealing with construction permits: Quality control before over time

  • Tunisia
  • Viet Nam
00.20.40.60.81201420162019

How they compare

Tunisia currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Viet Nam, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Viet Nam has been ahead every year.

Tunisia ranks 1st and Viet Nam ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Tunisia or Viet Nam?
Tunisia, at 1 DB16-20 methodology against 1 DB16-20 methodology in Viet Nam as of 2019.
What is the difference in dealing with construction permits: quality control before between Tunisia and Viet Nam?
0 DB16-20 methodology, with Tunisia ahead.
How many years of comparable data are there for Tunisia and Viet Nam?
6 years are reported by both, from 2014 to 2019.
How do Tunisia and Viet Nam rank globally for dealing with construction permits: quality control before?
Tunisia ranks 1st and Viet Nam ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Tunisia vs Viet Nam: Dealing with construction permits: Quality control before. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/tunisia/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/tunisia/viet-nam/">Tunisia vs Viet Nam: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.