Australia vs Kosovo: Dealing with construction permits: Quality control during
Australia
3 DB16-20 methodology
in 2019
Kosovo
2 DB16-20 methodology
in 2019
Australia rank
1st
Kosovo rank
20th
Dealing with construction permits: Quality control during over time
- Australia
- Kosovo
How they compare
Australia currently reports 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo, a difference of 1 DB16-20 methodology.
That makes Australia's figure about 1.5 times Kosovo's.
Across all 6 years both countries report, Australia has been ahead every year.
Australia ranks 1st and Kosovo ranks 20th of 185 countries.
Australia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Australia or Kosovo?
- Australia, at 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo as of 2019.
- What is the difference in dealing with construction permits: quality control during between Australia and Kosovo?
- 1 DB16-20 methodology, with Australia ahead.
- How many years of comparable data are there for Australia and Kosovo?
- 6 years are reported by both, from 2014 to 2019.
- How do Australia and Kosovo rank globally for dealing with construction permits: quality control during?
- Australia ranks 1st and Kosovo ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.