Austria vs Chile: Dealing with construction permits: Quality control during construction
Austria
2 DB16-20 methodology
in 2019
Chile
2 DB16-20 methodology
in 2019
Austria rank
19th
Chile rank
19th
Dealing with construction permits: Quality control during construction over time
- Austria
- Chile
How they compare
Austria currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Chile, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Chile has been ahead every year.
Austria ranks 19th and Chile ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Austria or Chile?
- Austria, at 2 DB16-20 methodology against 2 DB16-20 methodology in Chile as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Austria and Chile?
- 0 DB16-20 methodology, with Austria ahead.
- How many years of comparable data are there for Austria and Chile?
- 6 years are reported by both, from 2014 to 2019.
- How do Austria and Chile rank globally for dealing with construction permits: quality control during construction?
- Austria ranks 19th and Chile ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.