Azerbaijan, Republic of vs Congo, Democratic Republic of the: Dealing with construction permits: Quality control during

Azerbaijan, Republic of
2 DB16-20 methodology
in 2019
Congo, Democratic Republic of the
2 DB16-20 methodology
in 2019
Azerbaijan, Republic of rank
20th
Congo, Democratic Republic of the rank
20th

Dealing with construction permits: Quality control during over time

  • Azerbaijan, Republic of
  • Congo, Democratic Republic of the
00.511.52201420162019

How they compare

Azerbaijan, Republic of currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Congo, Democratic Republic of the, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Azerbaijan, Republic of ahead.

Azerbaijan, Republic of ranks 20th and Congo, Democratic Republic of the ranks 20th of 185 countries.

Azerbaijan, Republic of has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Azerbaijan, Republic of or Congo, Democratic Republic of the?
Azerbaijan, Republic of, at 2 DB16-20 methodology against 2 DB16-20 methodology in Congo, Democratic Republic of the as of 2019.
What is the difference in dealing with construction permits: quality control during between Azerbaijan, Republic of and Congo, Democratic Republic of the?
0 DB16-20 methodology, with Azerbaijan, Republic of ahead.
How many years of comparable data are there for Azerbaijan, Republic of and Congo, Democratic Republic of the?
6 years are reported by both, from 2014 to 2019.
How do Azerbaijan, Republic of and Congo, Democratic Republic of the rank globally for dealing with construction permits: quality control during?
Azerbaijan, Republic of ranks 20th and Congo, Democratic Republic of the ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Azerbaijan, Republic of vs Congo, Democratic Republic of the: Dealing with construction permits: Quality control during. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/azerbaijan/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/azerbaijan/congo-dem-rep/">Azerbaijan, Republic of vs Congo, Democratic Republic of the: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.