Bahamas vs Mozambique: Dealing with construction permits: Quality control during
Bahamas
2 DB16-20 methodology
in 2019
Mozambique
2 DB16-20 methodology
in 2019
Bahamas rank
20th
Mozambique rank
20th
Dealing with construction permits: Quality control during over time
- Bahamas
- Mozambique
How they compare
Bahamas currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Mozambique, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Mozambique has been ahead every year.
Bahamas ranks 20th and Mozambique ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Bahamas or Mozambique?
- Bahamas, at 2 DB16-20 methodology against 2 DB16-20 methodology in Mozambique as of 2019.
- What is the difference in dealing with construction permits: quality control during between Bahamas and Mozambique?
- 0 DB16-20 methodology, with Bahamas ahead.
- How many years of comparable data are there for Bahamas and Mozambique?
- 6 years are reported by both, from 2014 to 2019.
- How do Bahamas and Mozambique rank globally for dealing with construction permits: quality control during?
- Bahamas ranks 20th and Mozambique ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.