Bahrain vs Democratic Republic of Congo: Dealing with construction permits: Quality control during

Bahrain
2 DB16-20 methodology
in 2019
Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Bahrain rank
20th
Democratic Republic of Congo rank
20th

Dealing with construction permits: Quality control during over time

  • Bahrain
  • Democratic Republic of Congo
00.511.52201420162019

How they compare

Bahrain currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of Congo, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Bahrain ahead.

Bahrain ranks 20th and Democratic Republic of Congo ranks 20th of 185 countries.

Bahrain has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Bahrain or Democratic Republic of Congo?
Bahrain, at 2 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of Congo as of 2019.
What is the difference in dealing with construction permits: quality control during between Bahrain and Democratic Republic of Congo?
0 DB16-20 methodology, with Bahrain ahead.
How many years of comparable data are there for Bahrain and Democratic Republic of Congo?
6 years are reported by both, from 2014 to 2019.
How do Bahrain and Democratic Republic of Congo rank globally for dealing with construction permits: quality control during?
Bahrain ranks 20th and Democratic Republic of Congo ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahrain vs Democratic Republic of Congo: Dealing with construction permits: Quality control during. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/bahrain/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/bahrain/congo-dem-rep/">Bahrain vs Democratic Republic of Congo: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.