Bahrain vs Costa Rica: Dealing with construction permits: Quality control during
Bahrain
2 DB16-20 methodology
in 2019
Costa Rica
2 DB16-20 methodology
in 2019
Bahrain rank
20th
Costa Rica rank
20th
Dealing with construction permits: Quality control during over time
- Bahrain
- Costa Rica
How they compare
Bahrain currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Costa Rica, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Costa Rica has been ahead every year.
Bahrain ranks 20th and Costa Rica ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Bahrain or Costa Rica?
- Bahrain, at 2 DB16-20 methodology against 2 DB16-20 methodology in Costa Rica as of 2019.
- What is the difference in dealing with construction permits: quality control during between Bahrain and Costa Rica?
- 0 DB16-20 methodology, with Bahrain ahead.
- How many years of comparable data are there for Bahrain and Costa Rica?
- 6 years are reported by both, from 2014 to 2019.
- How do Bahrain and Costa Rica rank globally for dealing with construction permits: quality control during?
- Bahrain ranks 20th and Costa Rica ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.