Belize vs Benin: Dealing with construction permits: Quality control during construction
Belize
0 DB16-20 methodology
in 2019
Benin
0 DB16-20 methodology
in 2019
Belize rank
157th
Benin rank
157th
Dealing with construction permits: Quality control during construction over time
- Belize
- Benin
How they compare
Belize currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Benin, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Benin has been ahead every year.
Belize ranks 157th and Benin ranks 157th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Belize or Benin?
- Belize, at 0 DB16-20 methodology against 0 DB16-20 methodology in Benin as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Belize and Benin?
- 0 DB16-20 methodology, with Belize ahead.
- How many years of comparable data are there for Belize and Benin?
- 6 years are reported by both, from 2014 to 2019.
- How do Belize and Benin rank globally for dealing with construction permits: quality control during construction?
- Belize ranks 157th and Benin ranks 157th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.