Belize vs Niger: Dealing with construction permits: Quality control during construction

Belize
0 DB16-20 methodology
in 2019
Niger
0 DB16-20 methodology
in 2019
Belize rank
157th
Niger rank
157th

Dealing with construction permits: Quality control during construction over time

  • Belize
  • Niger
00.20.40.60.81201420162019

How they compare

Belize currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Niger, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Niger has been ahead every year.

Belize ranks 157th and Niger ranks 157th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Belize or Niger?
Belize, at 0 DB16-20 methodology against 0 DB16-20 methodology in Niger as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Belize and Niger?
0 DB16-20 methodology, with Belize ahead.
How many years of comparable data are there for Belize and Niger?
6 years are reported by both, from 2014 to 2019.
How do Belize and Niger rank globally for dealing with construction permits: quality control during construction?
Belize ranks 157th and Niger ranks 157th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.