Bolivia, Plurinational State of vs Republic of Korea: Dealing with construction permits: Quality control during

Bolivia, Plurinational State of
2 DB16-20 methodology
in 2019
Republic of Korea
2 DB16-20 methodology
in 2019
Bolivia, Plurinational State of rank
20th
Republic of Korea rank
20th

Dealing with construction permits: Quality control during over time

  • Bolivia, Plurinational State of
  • Republic of Korea
00.511.52201420162019

How they compare

Bolivia, Plurinational State of currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Republic of Korea, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Republic of Korea has been ahead every year.

Bolivia, Plurinational State of ranks 20th and Republic of Korea ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Bolivia, Plurinational State of or Republic of Korea?
Bolivia, Plurinational State of, at 2 DB16-20 methodology against 2 DB16-20 methodology in Republic of Korea as of 2019.
What is the difference in dealing with construction permits: quality control during between Bolivia, Plurinational State of and Republic of Korea?
0 DB16-20 methodology, with Bolivia, Plurinational State of ahead.
How many years of comparable data are there for Bolivia, Plurinational State of and Republic of Korea?
6 years are reported by both, from 2014 to 2019.
How do Bolivia, Plurinational State of and Republic of Korea rank globally for dealing with construction permits: quality control during?
Bolivia, Plurinational State of ranks 20th and Republic of Korea ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bolivia, Plurinational State of vs Republic of Korea: Dealing with construction permits: Quality control during. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/bolivia/korea-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/bolivia/korea-rep/">Bolivia, Plurinational State of vs Republic of Korea: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.