Botswana vs Thailand: Dealing with construction permits: Quality control during
Botswana
2 DB16-20 methodology
in 2019
Thailand
2 DB16-20 methodology
in 2019
Botswana rank
20th
Thailand rank
20th
Dealing with construction permits: Quality control during over time
- Botswana
- Thailand
How they compare
Botswana currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Thailand has been ahead every year.
Botswana ranks 20th and Thailand ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Botswana or Thailand?
- Botswana, at 2 DB16-20 methodology against 2 DB16-20 methodology in Thailand as of 2019.
- What is the difference in dealing with construction permits: quality control during between Botswana and Thailand?
- 0 DB16-20 methodology, with Botswana ahead.
- How many years of comparable data are there for Botswana and Thailand?
- 6 years are reported by both, from 2014 to 2019.
- How do Botswana and Thailand rank globally for dealing with construction permits: quality control during?
- Botswana ranks 20th and Thailand ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.