Brunei vs Congo: Dealing with construction permits: Quality control during

Brunei
2 DB16-20 methodology
in 2019
Congo
2 DB16-20 methodology
in 2019
Brunei rank
20th
Congo rank
20th

Dealing with construction permits: Quality control during over time

  • Brunei
  • Congo
00.511.52201420162019

How they compare

Brunei currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Congo, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Congo has been ahead every year.

Brunei ranks 20th and Congo ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Brunei or Congo?
Brunei, at 2 DB16-20 methodology against 2 DB16-20 methodology in Congo as of 2019.
What is the difference in dealing with construction permits: quality control during between Brunei and Congo?
0 DB16-20 methodology, with Brunei ahead.
How many years of comparable data are there for Brunei and Congo?
6 years are reported by both, from 2014 to 2019.
How do Brunei and Congo rank globally for dealing with construction permits: quality control during?
Brunei ranks 20th and Congo ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei vs Congo: Dealing with construction permits: Quality control during. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/brunei-darussalam/congo-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/brunei-darussalam/congo-rep/">Brunei vs Congo: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.