Burkina Faso vs Lao People's Democratic Republic: Dealing with construction permits: Quality control during

Burkina Faso
2 DB16-20 methodology
in 2019
Lao People's Democratic Republic
2 DB16-20 methodology
in 2019
Burkina Faso rank
20th
Lao People's Democratic Republic rank
20th

Dealing with construction permits: Quality control during over time

  • Burkina Faso
  • Lao People's Democratic Republic
00.511.52201420162019

How they compare

Burkina Faso currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Lao People's Democratic Republic, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Lao People's Democratic Republic has been ahead every year.

Burkina Faso ranks 20th and Lao People's Democratic Republic ranks 20th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Burkina Faso or Lao People's Democratic Republic?
Burkina Faso, at 2 DB16-20 methodology against 2 DB16-20 methodology in Lao People's Democratic Republic as of 2019.
What is the difference in dealing with construction permits: quality control during between Burkina Faso and Lao People's Democratic Republic?
0 DB16-20 methodology, with Burkina Faso ahead.
How many years of comparable data are there for Burkina Faso and Lao People's Democratic Republic?
6 years are reported by both, from 2014 to 2019.
How do Burkina Faso and Lao People's Democratic Republic rank globally for dealing with construction permits: quality control during?
Burkina Faso ranks 20th and Lao People's Democratic Republic ranks 20th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Lao People's Democratic Republic: Dealing with construction permits: Quality control during. Statizoid. Retrieved 30 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/burkina-faso/lao-pdr/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/burkina-faso/lao-pdr/">Burkina Faso vs Lao People's Democratic Republic: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.