Cape Verde vs Indonesia: Dealing with construction permits: Quality control during
Cape Verde
2 DB16-20 methodology
in 2019
Indonesia
2 DB16-20 methodology
in 2019
Cape Verde rank
20th
Indonesia rank
20th
Dealing with construction permits: Quality control during over time
- Cape Verde
- Indonesia
How they compare
Cape Verde currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Indonesia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Indonesia has been ahead every year.
Cape Verde ranks 20th and Indonesia ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Cape Verde or Indonesia?
- Cape Verde, at 2 DB16-20 methodology against 2 DB16-20 methodology in Indonesia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Cape Verde and Indonesia?
- 0 DB16-20 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Indonesia?
- 6 years are reported by both, from 2014 to 2019.
- How do Cape Verde and Indonesia rank globally for dealing with construction permits: quality control during?
- Cape Verde ranks 20th and Indonesia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.