Cape Verde vs Japan: Dealing with construction permits: Quality control during
Cape Verde
2 DB16-20 methodology
in 2019
Japan
2 DB16-20 methodology
in 2019
Cape Verde rank
20th
Japan rank
20th
Dealing with construction permits: Quality control during over time
- Cape Verde
- Japan
How they compare
Cape Verde currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Japan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Japan has been ahead every year.
Cape Verde ranks 20th and Japan ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Cape Verde or Japan?
- Cape Verde, at 2 DB16-20 methodology against 2 DB16-20 methodology in Japan as of 2019.
- What is the difference in dealing with construction permits: quality control during between Cape Verde and Japan?
- 0 DB16-20 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Japan?
- 6 years are reported by both, from 2014 to 2019.
- How do Cape Verde and Japan rank globally for dealing with construction permits: quality control during?
- Cape Verde ranks 20th and Japan ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.