Cape Verde vs Spain: Dealing with construction permits: Quality control during construction
Cape Verde
2 DB16-20 methodology
in 2019
Spain
2 DB16-20 methodology
in 2019
Cape Verde rank
19th
Spain rank
19th
Dealing with construction permits: Quality control during construction over time
- Cape Verde
- Spain
How they compare
Cape Verde currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Spain has been ahead every year.
Cape Verde ranks 19th and Spain ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Cape Verde or Spain?
- Cape Verde, at 2 DB16-20 methodology against 2 DB16-20 methodology in Spain as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Cape Verde and Spain?
- 0 DB16-20 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Cape Verde and Spain rank globally for dealing with construction permits: quality control during construction?
- Cape Verde ranks 19th and Spain ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.