Cameroon vs Czechia: Dealing with construction permits: Quality control during
Cameroon
2 DB16-20 methodology
in 2019
Czechia
2 DB16-20 methodology
in 2019
Cameroon rank
20th
Czechia rank
20th
Dealing with construction permits: Quality control during over time
- Cameroon
- Czechia
How they compare
Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Czechia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Czechia has been ahead every year.
Cameroon ranks 20th and Czechia ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Cameroon or Czechia?
- Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Czechia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Cameroon and Czechia?
- 0 DB16-20 methodology, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Czechia?
- 6 years are reported by both, from 2014 to 2019.
- How do Cameroon and Czechia rank globally for dealing with construction permits: quality control during?
- Cameroon ranks 20th and Czechia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.