Cameroon vs Fiji: Dealing with construction permits: Quality control during construction
Cameroon
2 DB16-20 methodology
in 2019
Fiji
2 DB16-20 methodology
in 2019
Cameroon rank
19th
Fiji rank
19th
Dealing with construction permits: Quality control during construction over time
- Cameroon
- Fiji
How they compare
Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Fiji, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Fiji has been ahead every year.
Cameroon ranks 19th and Fiji ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Cameroon or Fiji?
- Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Fiji as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Cameroon and Fiji?
- 0 DB16-20 methodology, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Fiji?
- 6 years are reported by both, from 2014 to 2019.
- How do Cameroon and Fiji rank globally for dealing with construction permits: quality control during construction?
- Cameroon ranks 19th and Fiji ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.