Cameroon vs Papua New Guinea: Dealing with construction permits: Quality control during

Cameroon
2 DB16-20 methodology
in 2019
Papua New Guinea
2 DB16-20 methodology
in 2019
Cameroon rank
20th
Papua New Guinea rank
20th

Dealing with construction permits: Quality control during over time

  • Cameroon
  • Papua New Guinea
00.511.52201420162019

How they compare

Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Papua New Guinea, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Papua New Guinea has been ahead every year.

Cameroon ranks 20th and Papua New Guinea ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Cameroon or Papua New Guinea?
Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Papua New Guinea as of 2019.
What is the difference in dealing with construction permits: quality control during between Cameroon and Papua New Guinea?
0 DB16-20 methodology, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Papua New Guinea?
6 years are reported by both, from 2014 to 2019.
How do Cameroon and Papua New Guinea rank globally for dealing with construction permits: quality control during?
Cameroon ranks 20th and Papua New Guinea ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cameroon vs Papua New Guinea: Dealing with construction permits: Quality control during. Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/cameroon/papua-new-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/cameroon/papua-new-guinea/">Cameroon vs Papua New Guinea: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.