Cameroon vs Poland: Dealing with construction permits: Quality control during construction
Cameroon
2 DB16-20 methodology
in 2019
Poland
2 DB16-20 methodology
in 2019
Cameroon rank
19th
Poland rank
19th
Dealing with construction permits: Quality control during construction over time
- Cameroon
- Poland
How they compare
Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Poland, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Poland has been ahead every year.
Cameroon ranks 19th and Poland ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Cameroon or Poland?
- Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Poland as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Cameroon and Poland?
- 0 DB16-20 methodology, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Poland?
- 6 years are reported by both, from 2014 to 2019.
- How do Cameroon and Poland rank globally for dealing with construction permits: quality control during construction?
- Cameroon ranks 19th and Poland ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.