Chile vs Czech Republic: Dealing with construction permits: Quality control during
Chile
2 DB16-20 methodology
in 2019
Czech Republic
2 DB16-20 methodology
in 2019
Chile rank
20th
Czech Republic rank
20th
Dealing with construction permits: Quality control during over time
- Chile
- Czech Republic
How they compare
Chile currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Czech Republic, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Czech Republic has been ahead every year.
Chile ranks 20th and Czech Republic ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Chile or Czech Republic?
- Chile, at 2 DB16-20 methodology against 2 DB16-20 methodology in Czech Republic as of 2019.
- What is the difference in dealing with construction permits: quality control during between Chile and Czech Republic?
- 0 DB16-20 methodology, with Chile ahead.
- How many years of comparable data are there for Chile and Czech Republic?
- 6 years are reported by both, from 2014 to 2019.
- How do Chile and Czech Republic rank globally for dealing with construction permits: quality control during?
- Chile ranks 20th and Czech Republic ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.