شيلي vs ماليزيا: Dealing with construction permits: Quality control during
شيلي
2 DB16-20 methodology
in 2019
ماليزيا
2 DB16-20 methodology
in 2019
شيلي rank
20th
ماليزيا rank
20th
Dealing with construction permits: Quality control during over time
- شيلي
- ماليزيا
How they compare
شيلي currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in ماليزيا, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, ماليزيا has been ahead every year.
شيلي ranks 20th and ماليزيا ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, شيلي or ماليزيا?
- شيلي, at 2 DB16-20 methodology against 2 DB16-20 methodology in ماليزيا as of 2019.
- What is the difference in dealing with construction permits: quality control during between شيلي and ماليزيا?
- 0 DB16-20 methodology, with شيلي ahead.
- How many years of comparable data are there for شيلي and ماليزيا?
- 6 years are reported by both, from 2014 to 2019.
- How do شيلي and ماليزيا rank globally for dealing with construction permits: quality control during?
- شيلي ranks 20th and ماليزيا ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.