Chile vs Mongolia: Dealing with construction permits: Quality control during construction
Chile
2 DB16-20 methodology
in 2019
Mongolia
2 DB16-20 methodology
in 2019
Chile rank
19th
Mongolia rank
19th
Dealing with construction permits: Quality control during construction over time
- Chile
- Mongolia
How they compare
Chile currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Mongolia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Mongolia has been ahead every year.
Chile ranks 19th and Mongolia ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Chile or Mongolia?
- Chile, at 2 DB16-20 methodology against 2 DB16-20 methodology in Mongolia as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Chile and Mongolia?
- 0 DB16-20 methodology, with Chile ahead.
- How many years of comparable data are there for Chile and Mongolia?
- 6 years are reported by both, from 2014 to 2019.
- How do Chile and Mongolia rank globally for dealing with construction permits: quality control during construction?
- Chile ranks 19th and Mongolia ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.