Comoros vs Ecuador: Dealing with construction permits: Quality control during construction

Comoros
0 DB16-20 methodology
in 2019
Ecuador
0 DB16-20 methodology
in 2019
Comoros rank
157th
Ecuador rank
157th

Dealing with construction permits: Quality control during construction over time

  • Comoros
  • Ecuador
00.20.40.60.81201420162019

How they compare

Comoros currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Ecuador, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Ecuador has been ahead every year.

Comoros ranks 157th and Ecuador ranks 157th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Comoros or Ecuador?
Comoros, at 0 DB16-20 methodology against 0 DB16-20 methodology in Ecuador as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Comoros and Ecuador?
0 DB16-20 methodology, with Comoros ahead.
How many years of comparable data are there for Comoros and Ecuador?
6 years are reported by both, from 2014 to 2019.
How do Comoros and Ecuador rank globally for dealing with construction permits: quality control during construction?
Comoros ranks 157th and Ecuador ranks 157th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.